One Step Further
Sunday, August 31, 2014
West Seattle Bathroom Installed with Marmoleum Concrete, Fossil #3708
This is the finished floor after required floor prep and installation of Marmoleum Concrete, Fossil #3708
Ballard Kitchen Installed with Marmoleum Real, Shell #3075
This is the finished kitchen after prepping the floor and installing the marmoleum.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)