One Step Further
Tuesday, September 2, 2014
Cafe Allegro Seattle
The first two pictures were taken when the floor prep was done, and the floor was ready to be installed. The last three are with the floor completed and the baseboards in place.
Berber Carpet and Cove Base in a Play Room
There are many colors of cove base available.
West Seattle Bathroom Installed with Marmoleum (Discontinued)
This color is no longer available, but there are many colors that are close.
Sunday, August 31, 2014
West Seattle Bathroom Installed with Marmoleum Concrete, Fossil #3708
This is the finished floor after required floor prep and installation of Marmoleum Concrete, Fossil #3708
Ballard Kitchen Installed with Marmoleum Real, Shell #3075
This is the finished kitchen after prepping the floor and installing the marmoleum.
Sunday, February 9, 2014
Marmoleum kitchen
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)