The first photo is after the floor leveling has been completed in the
kitchen, and the second is when the underlayment has been put down. The third is when the Rust Marmoleum has been installed. The last two pictures show the bathroom in the same residence done in Green Wellness Marmoleum.
No comments:
Post a Comment